Physical progress update
Financial progress update
Quantity Takeoffs
Received delay claim from contractor
Consumption Data Information
Hello LivSYT, give me an update on site’s physical progress?
| Activity Name | Status | Component | WBS Code | Current State |
|---|---|---|---|---|
| Concrete Work | ON_GOING | CCI_HSR_Pier_7 | 1.7.2.3 | ready_to_work |
| Design | ON_GOING | CCI_HSR_Pier_10 | 1.10.1.1 | ready_to_work |
| Design | ON_GOING | CCI_HSR_Pier_12 | 1.12.1.1 | ready_to_work |
| Reinforcement Work | ON_GOING | CCI_HSR_Pier_7 | 1.7.2.1 | ready_to_work |
| Component | Design | Bar Bending | Reinforcement | Shuttering | Concrete | Checkpoints |
|---|---|---|---|---|---|---|
| Pier 1 | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Pier 2 | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Pier 3 | ✓ | ✓ | ✓ | ✓ | ✓ | Pending |
| Pier 4 | ✓ | Pending | Pending | Pending | Pending | Pending |
| Pier 5 | ✓ | Pending | Pending | Pending | Pending | Pending |
Do you want to know what factors are causing the delay in Pier 4 and Pier 5 activities?
Hello LivSYT, give me an update on site's Financial Progress?
| Component | Planned Budget | Actual Spend | % Utilized |
|---|---|---|---|
| Pier Construction | ₹85 Crore | ₹72.3 Crore | 85% |
| Reinforcement | ₹35 Crore | ₹29.4 Crore | 84% |
| Design & Engineering | ₹25 Crore | ₹22.5 Crore | 90% |
| Equipment | ₹45 Crore | ₹38.7 Crore | 86% |
| Miscellaneous | ₹60 Crore | ₹35.1 Crore | 58% |
Overall Budget Utilization: 79%
What is month by month spend on material consumption during last 6 months?
Hello LivSYT, give me the activity details of WBS 2.1 ?
Let me look that up for you. Here are the details for the activity with WBS code "2.1"
Activity Information:
- Activity Name: Subgrade Top
- Module Name: Module (2.3.2.6)
Do you want this change to reflect in the BOQ/Material Consumption Report as well?
Hello LivSYT, Can you review the contractor’s delay claim, verify it against our project records, determine our legitimate exposure, and draft the response letter?
Multiple datasets were analyzed:
| Category | Days | Period | Notes |
|---|---|---|---|
| Eligible delay | 2 days | 12–14 Aug | Verified and attributable to delayed drawing approval |
| Non-eligible delay | 5 days | 14–19 Aug | Caused by contractor mobilization lag |
| Recommended settlement | ₹24,000 (2 days × ₹12,000/day) | ||
Supporting evidence includes:
Draft complete – includes:
Hello LivSYT, Can you verify the consumption data information to make sure it's accurate?
I've verified the project data against our records and found the following:
Note: There's a 5% variance in equipment allocation that needs reconciliation.
Would you like me to update the resource plan based on these findings?